Monday, March 5, 2012

Deconstruction at the Austin House

Host Kevin OConnor and master carpenter Norm Abram arrive back in Austin, Texas with a visit to the spring fed pool at Barton Springs, a favorite local outdoor hangout since the 1920s. Back at the house, the first truckload of framing material arrives, while Bills crew is busy deconstructing the house. Program manager Richard Morgan drops by to explain what well need to do to qualify for a rare 5-Star rating from Austin Energys Green Building Program. To gain access to the much-needed workspace in the attic, the inefficient old system must go, so HVAC contractor Michael Scher begins outside, by draining and recycling the refrigerant from the old A/C unit. Curious about where the waste from our jobsite ends up, Kevin follows a dumpster of construction waste from our jobsite to a recycling center, and then to an integrated landfill where dimensional lumber and wallboard are turned into mulch and organic compost. Builder Bill Moore works quickly on framing the new addition, to get the building closed in before the rainy season begins.



http://www.youtube.com/watch?v=LaHAfsbYDYw&hl=en

See Also : SEO LCD TV Cheap Deals

No comments:

Post a Comment